Skip to main content
Loading…
This section is included in your selections.

Any requirement imposed by the Santa Cruz water pollution control plant and approved by the District Engineer, that is greater than, or in addition to, the above shall be the controlling requirement. (Ord. 72 §1, 1991; Ord. 64 §2; Ord. 37 §2, 1983; Ord. 3 §5.6, 1973)