Skip to main content
Loading…
This section is included in your selections.

A. In addition to all other charges of the District, and which shall be collected, prior to the connection to the sanitary sewer system of the District, a special connection charge for any lot or parcel of property that abuts on or can be served by a sewer main or facility of the District constructed pursuant to special assessment proceedings of the Freedom Boulevard Sewer Assessment District.

B. The amount of the repayment fee for new connections shall be:

1. For a residential dwelling unit, the repayment fee shall be $2,484.47 per independent dwelling unit for new connection proposals.

2. For each school or commercial type of facility, the repayment fee shall be $2,484.47 per equivalent dwelling unit (EDU) of estimated water usage of the facility, with two hundred fifty gallons per day (gpd) of water usage equal to an EDU, as determined by the District Engineer.

3. Exemption. The new connection of a structure to the sewer system which does not utilize the improvements constructed by the Freedom Boulevard Sewer Assessment District shall be exempt from the repayment fee.

4. The funds collected from the repayment fees shall be deposited into the debt service fund, and the repayment fee shall be discontinued at such time that the District has recovered the financial contribution made toward improvements constructed by the Freedom Boulevard Sewer Assessment District in the amount of $345,341.43. (Ord. 84 §1)