Skip to main content
Loading…
Article II. Requirements Generally
This article is included in your selections.
This section is included in your selections.

The construction of the Building Sewer and the connection to the Public Sewer shall conform to the requirements of the building and plumbing code or other applicable rules and regulations of the District. New and existing plumbing fixture tallies shall be part of the required inspection. If more fixture units are determined than what was paid at the time of permit issuance, then payment for the extra fixture unit charges shall be made prior to building occupancy or permit sign-off. If an excessive amount of unapproved fixtures have been installed without permit, then the owner must first receive written approval from the District for those fixtures to remain connected to the District’s sewer before building occupancy will be granted. The District Engineer may determine where and how the connection is to be made. The Private Sewer Lateral shall be installed and connected to Public Sewer by a contractor licensed in the state of California. (Ord. 141 §2, 2019; Ord. 72 §1, 1991; Ord. 15 §3, 1975; Ord. 3 §3.1, 1973)