Inspection will be made by the District Engineer or his delegated representative and no building sewer connection shall be made without the presence of an authorized District representative, unless per­ mission has been granted to proceed in his absence. New and existing plumbing fixture tallies shall be part of the required inspection. If more fixture units are determined than what was paid at the time of permit issuance, then payment for the extra fixture unit charges shall be made prior to building occupancy or permit sign-off. If an excessive amount of unapproved fixtures have been installed without permit, then the owner must first receive written approval from the District for those fixtures to remain connected to the District’s sewer and before building occupancy will be granted. (Ord. 72 §1, 1991; Ord. 15 §3, 1975; Ord. 3 §3.2, 1973)